AirTrunk JHB2
AirTrunk’s second Johor campus, announced in early 2025 and stated as scalable to over 270 MW with a low design PUE of 1.25. Together JHB1 and JHB2 represent more than 420 MW of planned IT load.
Facility
| Operator | AirTrunk |
| Location | Iskandar Puteri, Johor |
| Status | Under construction |
| Type | Hyperscale |
| Capacity | 270 MW |
| Announced | 2025 |
Source
This record is compiled from the following public source:
AirTrunk: second Malaysia hyperscale data centre (JHB2) →
Status and capacity reflect the latest public information and change quickly in an active build-out. Figures are guidance, not a substitute for operator confirmation.
In Iskandar Puteri
A planned mixed-use city within Iskandar Malaysia, drawing office, education and residential investment.
Iskandar Puteri market data & submarket guide →More data centres in Johor
Princeton Digital Group JH1
OperationalPrinceton Digital Group (PDG) · Sedenak
Vantage Data Centers Johor (formerly Yondr)
Under constructionVantage Data Centers · Sedenak
Bridge Data Centres MY06
OperationalBridge Data Centres · Sedenak
K2 Strategic JHR1
OperationalK2 Strategic (Kuok Group) · Sedenak
EdgeConneX Johor
Under constructionEdgeConneX · Kulai
YTL Green Data Center Park
Under constructionYTL Power / YTL Data Center Holdings · Kulai